FAQs
ORDERING –MOQ
Our minimum order should be of USD 5000/-. This could include an assorted range of textile made-ups.
Shipping
The order will be shipped by air or sea (container loads) , depending on the quantity. Less than a container load will be shipped as required and container loads will be shipped by sea.
Shipping Lead Times
Delivery lead time is 60-75 days. If the order is less than a container , the lead time could be 40-60 days.
Terms of Payment
• Payment will be accepted by the following means-
• LC at sight
• 35% order amount as advance
• Documents against payment